检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:赵帅锋 ZHAO Shuaifeng(China Railway Design Corporation,Tianjin 300251,China)
出 处:《铁道勘察》2024年第3期51-56,102,共7页Railway Investigation and Surveying
基 金:中国铁路设计集团有限公司科技开发计划重点课题(2023A0240101)。
摘 要:为提升铁路工务设备养护管理的技术内涵和精细化水平,采用实景三维可视化、BIM和GIS技术构建三维WebGIS平台,并建立铁路工务设备3DGIS可视化台账,以实现铁路工务数字孪生世界构建与病害问题的动态可视化维护。平台利用Cesium引擎将工务设备模型和铁路三维实景地理信息数据进行网络化调用,实现工务设施三维场景与设备养护信息化的协同管理,并通过设置设备养护检查周期,对生产检查任务进行自动提示和预警。研究表明,系统可为铁路一线工务部门搭建设“施治理-问题填报-信息可视化-整治维护-数据分析”全链条的三维GIS工务管理服务,有效提高铁路工务管理的信息化、智能化水平。To improve the technical connotation and refinement level of railway public works equipment maintenance management,a three-dimensional WebGIS platform was constructed using real 3D,BIM,and GIS technologies.With the 3DGIS ledger of railway public works established,the platform constructed a digital twin world of the railway labor and realized the dynamic visual maintenance of disease problems.The integrated engineering equipment model and railway 3D realistic geographic information data was networked and called in the platform with the help of the Cesium engine and the collaborative management of engineering facilitied 3D scene and equipment maintenance informatization was achieved.By setting equipment maintenance inspection cycles,automatic prompts and warnings were provided for production inspection tasks.The system could build a three-dimensional GIS public works management service for the whole chain of facility governance,problem filling,information visualization,rectification and maintenance,data analysis for the railway front-line public works departments,which can effectively improve the informatization and intelligence level of railway public works management.
关 键 词:铁路 工务设备 三维GIS 维修养护 BIM 倾斜摄影
分 类 号:U216[交通运输工程—道路与铁道工程] P208.2[天文地球—地图制图学与地理信息工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.200