130 t/h纯烧生物质流化床锅炉试运问题分析  

Analysis on Trial Operation of 13Ot/h Biomass Fluidized Bed Boiler

在线阅读下载全文

作  者:王松涛 WANG Song-tao(Harbin Huitong Electric Power Engineering Co.,Ltd.)

机构地区:[1]哈尔滨汇通电力工程有限公司

出  处:《电站系统工程》2024年第3期71-72,75,共3页Power System Engineering

摘  要:近年来,国内纯烧生物质流化床型锅炉发展很快,容量、参数逐步提高。由于锅炉升级快,成型经验少,经常暴露出诸多该锅炉特有的试运问题,制约锅炉如期投产发电。以某生物质发电项目(1×30 MW)的5X130-SM1型高温高压纯烧生物质的流化床锅炉为例,对锅炉投产前燃烧系统出现的问题(如:返料器堵塞、床料流化不良、燃烧器超温损坏等)原因进行分析,介绍解决方法。In recent years,the domestic pure burning biomass fluidized bed boiler developed rapidly.But many specific trial operation problems are exposed,impacts on boiler operation on schedule.Take a Biomass Power Generation Project(1×30MW)of 5X130-SM1-type high-temperature high-pressure biomass CFB boiler as an example,the main problems of the boiler combustion system before production,such as:back feeder blocking,bed material fluidization,burner over-temperature damage,etc.,for analysis,introduced the solution.

关 键 词:生物质 循环流化床 燃烧问题 原因 解决 

分 类 号:TK17[动力工程及工程热物理—热能工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象