Optimization of gas lift system for well performance improvement in Asmari formation:A techno-economic perspective  

在线阅读下载全文

作  者:Hari Sreenivasan Jash Patel Dev Jain Setu Patel Isaac Wilson Shanker Krishna 

机构地区:[1]Drilling,Cementing&Stimulation(DCS)Research Centre,Department of Petroleum Engineering,School of Energy Technology(SoET),Pandit Deendayal Energy University(PDEU),Knowledge Corridor,Raysan,Gandhinagar,Gujarat,382426,India

出  处:《Petroleum Research》2024年第1期115-124,共10页石油研究(英文)

摘  要:Well productivity in the Asmari carbonate formation of southwest Iran has decreased in recent years as a result of production issues.The production rate must be maintained below 1500 STB/day to prevent water coning.In this study,a gas lift well is modeled using data from one of the producing wells of this field.Nodal analysis is performed using lift-gas injection rates and wellhead pressures at different reservoir pressures and water cut conditions to optimize production.Economic aspects are considered to optimize the artificial gas injection rates at different tubing head pressures and water cut conditions.Increasing the lift-gas injection rate from 0.4 MMscf/day to 1 MMscf/day enhances the oil production rate by 37.71%and 43.89%for 10%and 30%water cut conditions,respectively.Gas injection rates of 5.2 MMscf/day and 5.4 MMscf/day are determined to be economically optimal for 30%water cut with tubing head pressures of 260 psig and 270 psig,respectively.

关 键 词:Production enhancement Artificial lift Gas lift Asmari carbonate formation Techno-economic analysis Well productivity 

分 类 号:F426[经济管理—产业经济]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象