检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:Qian BAI Wen ZHAO Yingda ZHANG Pengjiao JIA Xiangrui MENG Bo LU Xin WANG Dazeng SUN
机构地区:[1]School of Resources and Civil Engineering,Northeastern University,Shenyang 110819,China [2]Centre for Infrastructure Engineering and Safety,School of Civil and Environmental Engineering,The University of New South Wales,NSW 2052,Australia [3]School of Rail Transportation,Soochow University,Suzhou 215131,China [4]China Northeast Architectural Design and Research Institute Co.,Ltd.,Shenyang 110006,China
出 处:《Frontiers of Structural and Civil Engineering》2024年第1期122-136,共15页结构与土木工程前沿(英文版)
基 金:supported by the National Natural Science Foundation of China(Grant No.52108380);the Natural Science Foundation of Jiangsu Province of China(No.BK20210721);the Postdoctoral Research Foundation of China(No.2021M702400).
摘 要:In relation to the Shifu Road Station project on Line 4 of the Shenyang Metro in China,a small-pipe roof-beam method for constructing subway stations is presented.First,a numerical simulation was performed to optimize the supporting parameters of the proposed method and determine the design scheme.Subsequently,the deformation of the pipe roof and surface settlement during the construction process were investigated.Finally,the surface settlement attributed to the excavation was studied through field monitoring,and the proposed method was compared with other methods.The results show that an increase in the pipe-roof spacing has little effect on the surface settlement and piperoof deformation.The bearing capacity of the pipe roof can be efficiently utilized once the flexural stiffness reaches 2EI,and the flexural stiffness is not the dominant factor controlling the deformation.The essential stages in controlling surface settlement are the excavations of the transverse pilot tunnels and the soil between them.The final settlement value of the ground was 24.1 mm,resulting in a reduction in the construction period by at least five months while satisfying the control requirements.
关 键 词:subway station pipe-roof method surface settlement SIMULATION on-site monitoring
分 类 号:U231.4[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222