检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:阎波[1] 张海涛 张宗友 王志永[1] 杨会永 YAN Bo;ZHANG Haitao;ZHANG Zongyou;WANG Zhiyong;YANG Huiyong(Beijing Shougang Qianan Iron and Steel Co.,Ltd.,Tangshan,Hebei 064404,China)
出 处:《冶金动力》2024年第3期35-38,共4页Metallurgical Power
摘 要:随着钢铁企业产品结构改革和高质量发展的需要,企业蒸汽需求与产蒸汽的能力出现矛盾,尤其冬季采暖季期间更突出,企业为满足蒸汽需求进行发电机组的供热改造势在必行。针对钢铁企业发电机组将纯凝机组改造成纯凝加背压机组的供热改造方案,结合实施过程中出现的问题,提出相应优化解决方案。With the reform of the product structure of the iron and steel enterprises and the need for high-quality development,there is a contradiction between the demand for steam and the ability to produce steam,which is especially prominent during the winter heating season.It is imperative for companies to retrofit their generating units for heating to meet steam demand.Aiming at the heat supply transformation plan for iron and steel enter-prises'generating units to transform pure condensing units into pure condensing and back-pressure units,combining with the problems in the implementation process,the correspond-ing optimization solutions are proposed.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117