检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘周巍 朱啟成 罗麒杰 周宇超 LIU Zhouwei;ZHU Qicheng;LUO Qijie;ZHOU Yuchao(Faculty of Surveying and Mapping,Kunming Metallurgy College,Kunming 650033,China;Institute of Spatial Information,Yunnan Institute of Water&Hydropower Engineering Investigation,Design and Research,Kunming 650201,China)
机构地区:[1]昆明冶金高等专科学校测绘学院,云南昆明650033 [2]云南省水利水电勘测设计研究院空间信息分院,云南昆明650201
出 处:《昆明冶金高等专科学校学报》2024年第2期33-38,共6页Journal of Kunming Metallurgy College
基 金:云南省教育厅科学研究基金“基于无人机实景三维对古村规划和文化保护的应用研究”(2024J1371)。
摘 要:在高海拔地区工程坐标系统建设中,对高精度GNSS测量投影变形方法的适用性进行理论与实证分析研究。结合云南高海拔地区程海水利联通工程项目实例,对工程测量中投影变形影响因素进行原因分析与公式推导,分析比较投影变形计算方法中投影面与投影中央子午线的不同组合方案。实例研究得出,在高海拔地区项目以测区平均高程为投影面,反算中央子午线,进行任意带中央子午线投影设置,投影变形最小,建立坐标系统效果最佳。The article made the theoretical and empirical analysis and research on the applicability of high-precision GNSS measurement projection deformation method in the construction of coordinate systems for water conservancy projects in high-altitude areas.It combines the example of the topographic mapping project of the water conservancy interconnection project in high-altitude areas of Yunnan Province to analyze the causes and derive formulas for the influencing factors of projection deformation in engineering measurement.The different combinations of projection surface and projection central meridian in projection deformation calculation methods are analyzed and compared.Empirical calculation research shows that in high-altitude areas,the project takes the average elevation of the measurement area as the projection surface and calculates the central meridian in reverse.It sets up a projection with a central meridian,minimizes projection deformation,and establishes the best coordinate system effect.
分 类 号:P231.5[天文地球—摄影测量与遥感]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.128.24.183