MT5500型矿用卡车后桥冷却系统改进措施  被引量:1

Improvement measures of rear axle cooling system of MT5500 mining trucks

在线阅读下载全文

作  者:高永飞 GAO Yongfei(Ha'erwusu Open-pit Coal Mine,China Energy Group Zhunge'er Energy Co.,Ltd.,Ordos 010300,China)

机构地区:[1]国能准能集团有限责任公司哈尔乌素露天煤矿,内蒙古鄂尔多斯010300

出  处:《露天采矿技术》2024年第3期83-85,共3页Opencast Mining Technology

摘  要:为避免MT5500型矿卡后桥冷却系统由过流、过压等现象引起的损坏现象,对MT5500型矿卡后桥冷却系统进行改造,改变现有主发电机三相绕组直接连接冷却风机的方案,通过在主发电机三相绕组和冷却风机之间增加1个风机控制变频器稳定冷却电机的电压和频率。结果表明:MT5500自卸车经过1年的试运行,改进后的卡车冷却系统工作良好,大大降低了MT5500后桥冷却系统的故障率,保证了车辆的安全稳定运行。In order to avoid the damage of the cooling system of MT5500 mine truck's rear axle caused by over-current and over-voltage,the mine reforms the cooling system of MT5500 mine truck's rear axle,and changes the existing scheme that the three-phase winding of the main generator was directly connected with the cooling fan,and adds a fan between the three-phase winding of the main generator and the cooling fan to control the inverter to stabilize the voltage and frequency of the cooling motor.The results show that after one-year trial operation on the MT5500 dump truck,the improved cooling system works well and greatly reduces the failure rate of the MT5500 rear axle cooling system,ensuring the safe and stable operation of the vehicle.

关 键 词:矿车后桥 冷却系统 风机控制 变频器 电控系统 

分 类 号:TD57[矿业工程—矿山机电]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象