检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘祥勇 冷海洋 LIU Xiangyong;LENG Haiyang(Nantong Urban Rail Transit Co.,Ltd.,226004,Nantong,China;China Urban Construction Design&Research Institute Co.,Ltd.,100120,Beijing,China)
机构地区:[1]南通城市轨道交通有限公司,南通226004 [2]中国城市建设研究院有限公司,北京100120
出 处:《城市轨道交通研究》2024年第6期54-59,共6页Urban Mass Transit
摘 要:[目的]在长江三角洲区域一体化的大背景下,南通新机场(枢纽)站等重要区域交通基础设施的引入,不仅将极大提升南通市的对外交通能力,也对南通城市轨道交通线网提出了更高的要求。如何在确保城市交通顺畅运行的基础上,实现轨道交通线网与对外交通枢纽的高效衔接,成为南通市交通规划必须面对的重要课题。[方法]通过对比分析南通市及周边城市对外交通枢纽的城市轨道交通衔接情况,结合上位规划及相应枢纽规划,深入分析了城市轨道交通线网与对外交通枢纽之间的互动关系,探讨了南通市轨道交通线网与枢纽的衔接策略,提出具有针对性的衔接建议方案。[结果及结论]南通城市轨道交通线网的构建主要以L形城市轨道交通线路为主。调整后的新线网规划方案增加了南通站的城市轨道交通线路数量,着重考虑了南部地区与南通站的直接联系,提升了南通市各功能区到达南通站的便捷程度,还考虑了城市轨道交通线网与南通新机场(枢纽)的衔接。[Objective]Under the background of regional integration of Yangtze River Delta,the introduction of important regional transportation infrastructures such as the new airport(hub)station in Nantong will not only greatly enhance the city's external transportation capacity,but also put forward higher requirements for the urban rail transit network in Nantong.On the basis of ensuring smooth operation of urban traffic,how to realize efficient connection between urban rail transit network and external transportation hub becomes an important issue that must be faced in Nantong transportation planning.[Method]Through comparative analysis of the connection between external transportation hubs and urban rail transit in Nantong and in its surrounding cities,and in the light of upper planning and corresponding hub planning,the interactive relation between urban rail transit network and external transportation hub is deeply analyzed,and the connection strategy between Nantong urban rail transit network and external transportation hubs is discussed,and finally targeted connection proposals are put forward.[Result&Conclusion]Nantong urban rail transit network was mainly constructed with L-shaped urban rail transit lines.After adjustment,the new network planning scheme increases the number of urban rail transit lines at Nantong Station,focusing on direct connection between the southern region and Nantong Station,thus improves the access convenience of Nantong functional areas to Nantong Station,and also takes into account the connection between urban rail transit network and the new airport(hub)in Nantong.
分 类 号:U212.1[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15