检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:杨立峰 史志峰 侯滨[1] Yang Lifeng;Shi Zhifeng;Hou Bin(Materials Branch of Shanxi Electric Power Company,State Grid,Taiyuan 030024,China;Material Management Department,Shanxi Electric Power Company,State Grid,Taiyuan 030025,China)
机构地区:[1]国网山西省电力公司物资分公司,太原030024 [2]国网山西省电力公司物资管理部,太原030025
出 处:《办公自动化》2024年第11期80-82,17,共4页Office Informatization
摘 要:考虑到电力物资受电力工程项目工期环境等因素影响,需求差异大且不确定性较强,对电力物资需求端一体化规划平台进行构建。根据实际设计需求以及标准,对平台的处理器和GPU等硬件方面进行设计。同时对电力物资需求一体化数据管理模块、物资需求提报与补库模块和规划数据可视化模块三个电力物资需求端一体化规划平台软件模块进行设计,实现构建电力物资需求端一体化规划平台。最终测试结果表明:电力物资需求端一体化规划平台有效地整合电力物资需求,提高电力物资规划的效率。Considering the electric power materials are affected by the factors such as the environment during the construction period of power engineering projects,and the demand difference is large and the uncertainty is strong,the integrated planning platform for the demand side of electric power materials is constructed.According to the actual design requirements and standards,the hardware aspects of the platform such as processor and GPU were designed.At the same time,three software modules of the integrated planning platform for the demand side of electric power materials are designed,namely,the integrated data management module for the demand side of electric power materials,the module for the demand side of material and materials,the module for the demand side of material and materials and the module for the replenishment of material and materials and the module for the visualization of planning data.The final test results show that the integrated planning platform of the demand side of electric power materials effectively integrates the demand of electric power materials and improves the efficiency of electric power materials planning.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222