作 者:杨永刚 Yang Yonggang(China Chemical Saiding Coking(Shanxi)Engineering Technology Co.,Ltd.,Taiyuan Shanxi 030032,China)
机构地区:[1]中化学赛鼎焦化(山西)工程科技有限公司,山西太原030032
出 处:《山西建筑》2024年第13期104-107,共4页Shanxi Architecture
摘 要:各类活动广场项目近年来较为常见,此类项目面积较大,铺装面层做法日益精细,且常需要进行基础回填。因回填土层较厚及工期紧张,后期容易出现沉降问题。针对重要工程前广场冬季回填可能带来的地面下沉问题,尝试采用方格网布置预应力PHC管桩作为场地支撑,地面混凝土垫层按照计算进行配筋作为场地支撑板。此方法施工速度快,可满足相关项目进度要求,经过实际使用检验,有效避免了土层沉降引发的地面变形开裂问题。Various types of square projects have become more common in recent years.These types of projects have a large area,and the paving method is becoming increasingly sophisticated.They often require foundation backfilling,and the thick backfill soil layer and tight construction period can easily lead to later settlement problems.This article focuses on the potential ground subsidence caused by winter backfilling of important engineering squares,and attempts to use prestressed PHC pipe piles arranged in a grid as site support.The ground concrete cushion layer is reinforced according to calculations as site support plates.This method has a fast construction speed and can meet the requirements of relevant project schedules.After practical use and testing,it effectively avoids the problem of ground deformation and cracking caused by soil settlement.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:52.14.186.192