检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:黄成成 钱旭林 HUANG Cheng-cheng;QIAN Xu-lin(Yunnan Hualian Zinc Indium Co.,Ltd.,Wenshan Prefecture,Yunnan Province 663701)
机构地区:[1]云南华联锌铟股份有限公司,云南文山州663701
出 处:《世界有色金属》2024年第8期29-32,共4页World Nonferrous Metals
摘 要:在露天矿山开采过程中,往往因无法准确估算计划采剥区域的废石量、矿石量、废石资源量,同时难以直观的看出短中期计划采剥区域在开挖后会形成一个怎样的空间形态以及计划采剥区域范围内矿石量和围岩量,而导致在做短中期采剥计划过程中无法进行合理的设备配置以及难以直观看到在短中期计划区域竣工后对整个采区下一步采剥规划的影响,主要包括:下一步采剥规划过程中的运输道路预布置、穿爆作业面布置、平台防排水沟道规划、动力管线布置等。本文主要介绍基于在露天矿山已应用3Dmine矿业软件完成对整个采剥区域的地质建模(主要包括采区的围岩、矿体、矿石品位、矿体号、经济类型、矿石种类)及每月计划结束后已完成地形图更新的基础上,应用3Dmine矿业软件对计划采剥区域块进行模拟设计,可解决上述问题。In the process of open-pit mining,it is often difficult to accurately estimate the amount of waste rock,ore,and waste rock resources in the planned mining area.At the same time,it is difficult to intuitively see what kind of spatial form the planned mining area will form after excavation in the short and medium term,as well as the amount of ore and surrounding rock within the planned mining area,As a result,reasonable equipment configuration cannot be achieved during the short and medium term mining and stripping planning process,and it is difficult to visually see the impact on the next mining and stripping planning of the entire mining area after the completion of the short and medium term planning area.This mainly includes the pre layout of transportation roads,the layout of blasting operation surfaces,the planning of platform drainage channels,and the layout of power pipelines in the next mining and stripping planning process.This article mainly introduces the application of 3Dmine mining software in open-pit mines to complete geological modeling of the entire mining and stripping area(mainly including the surrounding rock,ore body,ore grade,ore body number,economic type,and ore type),and on the basis of updating the topographic map after the monthly plan is completed,the application of 3Dmine mining software to simulate and design the planned mining and stripping area block can solve the above problems.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.191.31.104