凿井井架套立架下行式安装工艺的应用  

Application of Downward Installation Technology for Shaft Drilling Derrick

在线阅读下载全文

作  者:章超 ZHANG Chao(Tongling Nonferrous Metals Group Tongguan Mining Construction Co.,Ltd.,Anhui Tongling 244000)

机构地区:[1]铜陵有色金属集团铜冠矿山建设股份有限公司,安徽铜陵244000

出  处:《世界有色金属》2024年第7期190-192,共3页World Nonferrous Metals

摘  要:铜陵有色姚家岭矿业公司2#探矿井施工-600m中段探矿巷道,由井筒掘砌转探矿平巷施工需要进行临时改绞措施,须采用吊桶和罐笼两套提升系统。井筒-600m中段增设稳罐钢梁和手动托罐器,地表凿井井架下方增设套立架。套立架安装过程中首次采用下行式安装工艺,较传统上行式安装工艺工期由25天缩至20天,实现了快速安装施工,工程质量优良。In the construction of the exploration roadway in the middle section of the 6000m section of the 2#exploration well of Tongling Nonferrous Yaojialing Mining Company,temporary measures for changing the excavation and masonry of the shaft to the exploration level roadway need to be taken,and two sets of lifting systems,namely bucket and cage,must be used.Install a stabilizing steel beam and a manual tank support device in the middle section of the wellbore-600m,and install a sleeve stand below the surface drilling shaft frame.For the first time during the installation process of the scaffolding,the downward installation process was adopted,which reduced the construction period from 25 days to 20 days compared to the traditional upward installation process,achieving rapid installation construction and excellent engineering quality.

关 键 词:凿井井架 套立架 下行式安装 

分 类 号:TD262.3[矿业工程—矿井建设]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象