超大型取水工程取水头部及引水管线设计  

Design of Water Intake Head and Water Diversion Pipeline for Super Large Scale Water Intake Project

在线阅读下载全文

作  者:叶霖 郑刚 于阳 李洁 沈一挺 万扣强 YE Lin;ZHENG Gang;YU Yang;LI Jie;SHEN Yiting;WAN Kouqiang(Hangzhou Water Group Co.,Ltd.,Hangzhou 310000,China;Shanghai Municipal Engineering Design InstituteCo.,Ltd.,Shanghai 200092,China)

机构地区:[1]杭州市水务集团有限公司,浙江杭州310000 [2]上海市政工程设计研究总院<集团>有限公司,上海200092

出  处:《净水技术》2024年第S01期300-308,共9页Water Purification Technology

基  金:上海市科委“科技创新行动计划”(22dz1209103)。

摘  要:为减少水源保护与城市发展的矛盾,同时降低钱塘江盐水入侵对取水安全的威胁,杭州市启动了取水口上移工程。结合杭州市主城区水厂布局调整及千岛湖引水工程事故工况等因素,新建取水工程土建规模按远景300万m^(3)/d考虑,近期设备安装规模为170万m^(3)/d。根据本工程取水口涉水专题研究,取水口上移位置位于富春江石门沙南岸,现状萧山江东取水口上游约250 m处。通过综合比选,采用箱式取水头部,可有效保证取水安全,降低工程投资。根据取水头部和取水泵站两者位置,对引水管线路进行布置,通过水力计算确定采用2根DN3400钢管,全线采用顶管施工。为保障运行安全,设计考虑了引水管防淤积措施和取水头部防护警示设施。To mitigate the conflict between water resource protection and urban development,as well as to reduce the threat of saltwater intrusion into the Qiantang Riveron water intake security,Hangzhou has initiated the water intake relocation project.Considering factors such as the adjustment of waterworks layout in the main urban area of Hangzhou and accident conditions related to the Qiandao Lake water diversion project,the civil construction scale of the new water intake project is designed for a long-term capacity of 3 million m^(3)/d,with an initial equipment installation scale of 1.7 million m^(3)/d.According to the specialized research on the water intake of this project,the relocated water intake is situated on the south bank of Shimensha in the Fuchun River,approximately 250 m upstream from the current water intake of Xiaoshan Jiangdong.Through comprehensive selection,a box-type water intake head is chosen to effectively ensure water intake safety and reduce project investment.Considering the locations of both the water intake head and the water pumping station,the layout of the water diversion pipeline is arranged,with two DN3400 steel pipes selected based on hydraulic calculations.The entire pipeline is constructed by pipe jacking.To ensure operational safety,anti-sedimentation measures for the water diversion pipeline and protective warning facilities for the water intake head are considered in the design.

关 键 词:取水口上移 超大规模 取水头部 引水管 跨江顶管 防淤积措施 防护警示设施 

分 类 号:TU991[建筑科学—市政工程]

 