检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:郝以瑞 HAO Yirui(Malan Coal Mine,Shanxi Xishan Coal Electricity Co.,Ltd.,Taiyuan 030205,Shanxi,China)
机构地区:[1]山西西山煤电股份有限公司马兰矿,山西太原030205
出 处:《能源与节能》2024年第6期215-217,221,共4页Energy and Energy Conservation
摘 要:目前,中国矿井主要采用关节顶梁、液压支撑等单一立柱的被动式超前支护方式,很难在矿区实现无人值守。故而以回采巷道为研究对象,研究其在掘进过程关键环节中的影响规律,揭示掘进过程对掘进速度的影响,探索二者之间的内在联系,以期能够降低掘进成本,提高巷道的掘进效率。At present,China's mines mainly adopt the passive advanced support of single column such as joint roof beam and hydraulic support,which is difficult to achieve unattended in mining areas.Therefore,taking the mining roadway as the research object,its influence law in the key links of the excavation process was studied,the influence of the excavation process on the excavation speed was revealed,and the internal relationship between the two was explored,so as to reduce the excavation cost and improve the excavation efficiency of the roadway.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.219.92.7