紧抓四个“关键”做好船舶修期管控  

Grasping four keys in control of ship repair period

在线阅读下载全文

作  者:高春林 顾雪峰[2] 杨文超 GAO Chunlin;GU Xuefeng;YANG Wenchao

机构地区:[1]91007部队,浙江宁波315122 [2]海军工程大学船舶与海洋学院,湖北武汉430033

出  处:《中国修船》2024年第3期69-72,共4页China Shiprepair

基  金:湖北省自然科学基金项目(2018CFC866)。

摘  要:针对修期管控的要求,文章探讨了确保船舶修理质量和缩短船舶在厂修理时间的方法,在全面总结修期管控实践工作经验的基础上,分析了影响修理进度和质量的潜在问题因素,着重在修前准备、方案制定、强化配合、全程监管这四个“关键”环节提出了针对性措施,为有效解决船舶用修矛盾、提升保障效益提供支撑。According to the requirements for control of ship repair period,this paper discussed the methods to ensure the quality of ship repair and shorten the time of ship repair in the shipyard.The paper summarized the practical experience of repair period control and analyzed the potential factors affecting the repair progress and quality.Further,this paper put forward measures to emphasize the four key links of preparation before repair,development of repair plan,close cooperation and whole-process supervision,to effectively solve the problem of contradiction between ship use and repair and support the advance effectiveness.

关 键 词:船舶 修期管控 等级修理 修理方案 

分 类 号:U672[交通运输工程—船舶及航道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象