检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:陈红宝 CHEN Hongbao
机构地区:[1]中国能源建设集团云南火电建设有限公司,云南昆明650000
出 处:《电力系统装备》2024年第4期14-15,18,共3页Electric Power System Equipment
摘 要:目前,随着社会的进步、经济的发展,社会对于电能的需求也在持续增加。为了能够保障发电设备更好、更安全地运行,强化一次设备安装的质量管控工作,优化安装技术与方法,降低设备故障率,有利于提升变电站运行效率,为人们的生产、生活提供良好的电能保障。文章主要对变电站一次设备安装的质量控制及技术要点进行有效分析与讨论,旨在提升一次设备安装质量与效率,为电气设备安全、可靠的运行提供良好的保障。At present,with the development of society and economy,the demand for electric energy is increasing.In order to ensure better and safer operation of power generation equipment,to strengthen the quality control of primary equipment installation,to optimize installation technology and method,to reduce equipment failure rate,and to promote the operation efficiency of substations,for people’s production,life to provide a good electrical energy security.This paper mainly analyzes and discusses the quality control and technical points of the installation of primary electrical equipment in substations in order to improve the installation quality and efficiency,it provides a good guarantee for the safe and reliable operation of electrical equipment.
分 类 号:TM63[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15