检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:Kun Li Jiakun Fang Xiaomeng Ai Shichang Cui Rongkang Zhao Jinyu Wen
机构地区:[1]State Key Laboratory of Advanced Electromagnetic Engineering and Technology,School of Electrical and Electronic Engineering,Huazhong University of Science and Technology,Wuhan 430074,China [2]IEEE
出 处:《Journal of Modern Power Systems and Clean Energy》2024年第2期393-404,共12页现代电力系统与清洁能源学报(英文)
基 金:supported in part by the National Nature Science Foundation of China(No.52177088).
摘 要:Base station(BS)backup batteries(BSBBs),with their dispatchable capacity,are potential demand-side resources for future power systems.To enhance the power supply reliability and post-contingency frequency security of power systems,we propose a two-stage stochastic unit commitment(UC)model incorporating operational reserve and post-contingency frequency support provisions from massive BSBBs in cellular networks,in which the minimum backup energy demand is considered to ensure BS power supply reliability.The energy,operational reserve,and frequency support ancillary services are co-optimized to handle the power balance and post-contingency frequency security in both forecasted and stochastic variable renewable energy(VRE)scenarios.Furthermore,we propose a dedicated and scalable distributed optimization framework to enable autonomous optimizations for both dispatching center(DC)and BSBBs.The BS model parameters are stored and processed locally,while only the values of BS decision variables are required to upload to DC under the proposed distributed optimization framework,which safeguards BS privacy effectively.Case studies on a modified IEEE 14-bus system demonstrate the effectiveness of the proposed method in promoting VRE accommodation,ensuring post-contingency frequency security,enhancing operational economics,and fully utilizing BSBBs'energy and power capacity.Besides,the proposed distributed optimization framework has been validated to converge to a feasible solution with near-optimal performance within limited iterations.Additionally,numerical results on the Guangdong 500 kV provincial power system in China verify the scalability and practicality of the proposed distributed optimization framework.
关 键 词:Base station backup battery operational reserve frequency security distributed optimization PRIVACY
分 类 号:TM91[电气工程—电力电子与电力传动] TN929.5[电子电信—通信与信息系统]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117