Virtual Transmission Solution Based on Battery Energy Storage Systems to Boost Transmission Capacity  

在线阅读下载全文

作  者:Matías Agüero Jaime Peralta Eugenio Quintana Victor Velar Anton Stepanov Hossein Ashourian Jean Mahseredjian Roberto Cárdenas 

机构地区:[1]Coordinador Eléctrico Nacional,Santiago,Chile [2]PGSTech, Montreal, Canada [3]Ecole Polytechnique de Montréal, Montréal, Canada [4]University of Chile, Santiago, Chile [5]IEEE

出  处:《Journal of Modern Power Systems and Clean Energy》2024年第2期466-474,共9页现代电力系统与清洁能源学报(英文)

摘  要:The increasing penetration of variable renewable energy(VRE)generation along with the decommissioning of conventional power plants in Chile,has raised several operational challenges in the Chilean National Power Grid(NPG),including transmission congestion and VRE curtailment.To mitigate these limitations,an innovative virtual transmission solution based on battery energy storage systems(BESSs),known as grid booster(GB),has been proposed to increase the capacity of the main 500 kV corridor of the NPG.This paper analyzes the dynamic performance of the GB using a wide-area electromagnetic transient(EMT)model of the NPG.The GB project,composed of two 500 MVA BESS units at each extreme of the 500 kV corridor,allows increasing the transmission capacity for 15 min during N-1 contingencies,overcoming transmission limitations under normal operation conditions while maintaining system stability during faults.The dynamic behavior of the GB is also analyzed to control power flow as well as voltage stability.The results show that the GB is an effective solution to allow greater penetration of VRE generation while maintaining system stability in the NPG.

关 键 词:Battery energy storage system(BESS) grid booster transient stability voltage stability electromagnetic transient(EMT) 

分 类 号:TM73[电气工程—电力系统及自动化] TM91

 