检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:唐坤 高静贤 唐钷 TANG Kun;GAO Jingxian;TANG Po(CABR Testing Center Co.,Ltd.,Beijing 100013,China;National Engineering Research Center of Building Technology,Beijing 100013,China;China Building Technique Group Co.,Ltd.,Beijing 100013,China)
机构地区:[1]建研院检测中心有限公司,北京100013 [2]国家建筑工程技术研究中心,北京100013 [3]中国建筑技术集团有限公司,北京100013
出 处:《建筑钢结构进展》2024年第5期42-49,共8页Progress in Steel Building Structures
基 金:北京市科技服务业专项-科技服务品牌机构发展项目。
摘 要:提出一种装配式轻钢轻混凝土剪力墙与混凝土楼板的装配连接方式,为研究该连接节点的抗剪性能,开展了4个墙体-楼板连接试件的低周往复加载试验,分析了连接节点的滞回性能、刚度退化、延性、耗能能力及承载力性能。结果表明:不同连接构造形式对墙体-楼板连接节点的承载力影响显著,抗剪螺栓能有效提高节点的刚度与水平抗剪承载力;承载力分析结果显示,设有抗剪螺栓的连接节点承载力比预制墙体抗剪承载力高了34.3%,满足节点承载力要求,最后给出了装配式轻钢轻混凝土墙-楼板连接节点设计建议。This paper proposes an assembly connection method between prefabricated lightweight steel and lightweight concrete shear walls and concrete floors.In order to study the shear performance of the connection joint,low cycle reversed loading tests were conducted on four wall-floor connection specimens.The hysteresis performance,stiffness degradation,ductility,energy dissipation,and bearing capacity performance of the connection joints were analyzed.The results show that different connection structures have a significant impact on the bearing capacity of the wallfloor connection joints,and shear bolts can effectively improve the stiffness and horizontal shear bearing capacity of the joint;the bearing capacity analysis shows that the bearing capacity of connection joints with shear bolts is 34.3%higher than that of prefabricated walls,meeting the requirements for joint bearing capacity.Finally,design recommendations for prefabricated lightweight steel and lightweight concrete wall-floor connection joints are provided.
关 键 词:轻钢轻混凝土 预制剪力墙-楼板连接部 抗剪性能 低周往复加载试验
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.117.189.143