红牛铜矿超前切顶下向大直径深孔落矿阶段出矿嗣后充填法的研究与应用  

Research and Application of the Ore Extraction and Subsequent Filling Method in the Downward Large Diameter Deep Hole Mining Stage of the Advanced Top Cutting of Hongniu Copper Mine

在线阅读下载全文

作  者:李雪澜 施伟江 李晓斌 LI Xue-an;SHI Wei-jiang;LI Xiao-bin(Shangri-La Yunkuang Red Bull Mining Co.,Ltd.,Diqing 674400,China)

机构地区:[1]香格里拉市云矿红牛矿业有限公司,云南迪庆674400

出  处:《有色矿冶》2024年第3期11-14,共4页Non-Ferrous Mining and Metallurgy

摘  要:根据红牛铜矿东部KT2、KT2-1矿段采用的超前切顶下向大直径深孔落矿阶段出矿嗣后充填采矿法采矿工艺特点,通过结合当期生产试验阶段的生产实际情况,对工艺的优缺点和采矿方法的应用以及现场实践应用情况分析,对矿山今后开采积累了大量有价值的经验。According to the characteristics of the ore extraction and subsequent filling method in the downward large diameter deep hole mining stage of the advanced top cutting of KT2 and KT2-1 in the eastern part of the Red Bull Copper Mine,a lot of valuable experience has been accumulated in future mining by analyzing the advantages and disadvantages of the process,the application of mining methods and on-site practice by analyzing the actual production situation of the current production test stage.

关 键 词:大直径深孔 采矿方法 嗣后充填 采场布置 崩矿方式 

分 类 号:TD853[矿业工程—金属矿开采]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象