铁山港码头岸桥机轨道改造工程基础施工效率提升措施  

Measures to improve the efficiency of foundation construction for the track renovation project of the shore bridge crane at Tieshangang Port

在线阅读下载全文

作  者:宾善标 BIN Shan-biao(The First Installation Engineering Co.,Ltd.of Guangxi Construction Engineering Group,Nanning Guangxi,530001)

机构地区:[1]广西建工集团第一安装工程有限公司,广西南宁530001

出  处:《西部探矿工程》2024年第5期1-3,6,共4页West-China Exploration Engineering

摘  要:随着当代科学技术的不断进步,新技术、新设备推陈出新,加速了老旧设备的淘汰,北部湾区域港口码头在不断扩大建设的同时,随着新型码头专用设备的不断投入使用,已建设的码头陆上配套设施需要不断的更新改造来适应新型设备的运行。铁山港码头原有吊装设备为旧式门机,为适应新型码头吊装门机运行,码头管理部门规划在码头原有轨道后侧新建一条轨道梁及轨道。铁山港码头临海陆域工程地质情况简单,主要由吹填或陆地弃土填筑形成,地层成分主要为填土、砂层等,其地面高程低,地下水位高,地下水与海面持平,地下水位受潮水涨退影响较大。铁山港码头后方陆域岸桥轨道改造工程施工过程中地下水的合理科学处理与应对,是该工程施工的重点与难点,亦是该工程能否盈利的关键。With the continuous progress of contemporary science and technology,new technologies and equipment are being introduced,accelerating the elimination of old equipment.While the construction of ports and terminals in the Beibu Gulf region continues to expand,the onshore supporting facilities of the constructed terminals need to be constantly updated and transformed to adapt to the operation of new equipment.The original lifting equipment at Tieshangang Port was an old type gantry crane.In order to adapt to the operation of the new type of gantry crane at the port,the port management department plans to build a new track beam and track behind the original track at the port.The geological conditions of the Tieshangang Port coastal land area engineering are simple,mainly formed by hydraulic fill or land abandoned soil filling.The geological composition is mainly filled soil,sand layers,etc.The ground elevation is low,the groundwater level is high,and the groundwater level is level with the sea surface.The groundwater level is greatly affected by the rise and fall of tides.The reasonable and scientific treatment and response of groundwater during the construction process of the land area shore bridge track renovation project behind the Tieshan Port wharf is the key and difficult point of the project construction,as well as the key to whether the project can be profitable.

关 键 词:铁山港码头 岸桥轨道 潮水涨退 地下水 

分 类 号:U432[交通运输工程—道路与铁道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象