EBIS(改良AO)+磁混凝工艺在陕西某城市污水厂提标改造工程中的应用  被引量:1

Application of EBIS(Improved AO)+Magnetic Coagulation Process in Upgrading Project of A Municipal Sewage Plant in Shaanxi Province

在线阅读下载全文

作  者:林达 LIN Da(Fujian Provincial Institute of Architectural Design and Research Co.,Ltd.,Fujian Fuzhou 350001,China)

机构地区:[1]福建省建筑设计研究院有限公司,福建福州350001

出  处:《广州化工》2024年第4期137-138,166,共3页GuangZhou Chemical Industry

摘  要:陕西某城市污水处理厂总设计规模80000 m^(3)/d,其中40000 m^(3)/d生化池利用现状的CASS池进行改造,另外新建40000 m^(3)/d生化池及80000 m^(3)/d规模的深度处理设施。污水处理厂进水主要来源为城市生活污水,混合少量的工业污水,处理工艺采用“预处理+EBSI生化池+磁混凝沉淀池+次氯酸钠消毒”主体工艺,介绍了工程的工艺流程、主要设计参数及运行效果等。出水水质监测指标表明,本项目出水完全满足《陕西省黄河流域污水综合排放标准》(DB61/224-2018)中A标准。The total design capacity of a wastewater treatment plant in Shaanxi province was 80000 m^(3)/d,the capacity of 40000 m^(3)/d biochemical reaction basin has been modified by the current CASS basin,the other capacity of 40000 m^(3)/d biochemical reaction basin and the capacity of 80000 m^(3)/d advanced treatment facility will be built.The main source of the wastewater was from city sewage,and mixing a small amount of industrial wastewater,the main treatment process of“pretreatment+EBIS tank+Magnetic coagulation sedimentation tank+Sodium hypochlorite disinfection”was designed.The process flow,design parameters and operation effect of the project were introduced.The effluent monitoring index showed that the project meets the requirement of level A in DB61/224-2018 Integrated Wastewater Discharge Standard of Yellow River Basin in Shaanxi Province.

关 键 词:污水处理厂 EBIS工艺 磁混凝沉淀池 

分 类 号:TU992.3[建筑科学—市政工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象