检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:玉博 郑玮[2] 刘进 YU Bo;ZHENG Wei;LIU Jin(China Water Resources Beifang Investigation,Design and Research Co.Ltd.,Tianjin,300222;Xinjiang Water Resources and Hydropower Survey,Design and Research Institute Co.Ltd.,Urumqi,830000;Xinjiang Water Conservancy Development Investment(Group)Co.Ltd.,Urumqi,830099)
机构地区:[1]中水北方勘测设计研究有限责任公司,天津300222 [2]新疆水利水电勘测设计研究院有限责任公司,新疆乌鲁木齐830000 [3]新疆水利发展投资(集团)有限公司,新疆乌鲁木齐830099
出 处:《水利水电工程设计》2024年第2期23-27,共5页Design of Water Resources & Hydroelectric Engineering
摘 要:主要针对护盾式TBM法施工隧洞掘进过程中发生的“洞抱盾”问题进行研究,分析了围岩变形等因素造成TBM抱盾的成生机制,提出了预测方法与风险评估思路,用于前期勘察设计阶段的TBM抱盾卡机预测和评价。This paper mainly focuses on the problem of"shield gripping"that occurs during the tunnel excavation process using the shielded Tunnel Boring Machine(TBM).It analyzes the generation mechanism of shield gripping caused by factors such as rock deformation,and proposes a prediction method and risk assessment approach for shield gripping and jamming in the preliminary investigation and design stages.
分 类 号:U455[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.191.150.214