一起铁厂接入电网电能质量评估及治理分析  被引量:1

Analysis of Power Quality Assessment and Treatment of Iron Plant Connected to the Power Grid

在线阅读下载全文

作  者:张涛 程玉凯 ZHANG Tao;CHENG Yukai(State Grid Fujian Electric Power Co.,Ltd.Zhangzhou Power Supply Company,Zhangzhou 363000,China)

机构地区:[1]国网福建省电力有限公司漳州供电公司,福建漳州363000

出  处:《安徽电气工程职业技术学院学报》2024年第2期16-27,共12页Journal of Anhui Electrical Engineering Professional Technique College

摘  要:文章针对一起铁厂接入电网造成电能质量劣化这一问题,首先根据电网参数和厂家资料,利用公式推导计算电网电压波动和闪变值的超限情况;并在电力电气分析、电能管理的综合分析软件(ETAP)中搭建仿真模型进行计算,得出电压谐波含有率及谐波电流注入超限次数。根据对比计算结果,给出了电能质量治理建议,并通过后续实时监测,验证了文章中所提出的治理建议的有效性和合理性。In view of the power quality problems caused by the connection of iron plants to the power grid,according to the power grid parameters and manufacturer data,the overrun of the voltage fluctuation and flicker value of the two sections of the power grid is first deduced by formula.Then,the simulation model is built in ETAP software,and the voltage harmonic content rate and harmonic current injection overrun times are calculated by simulation.Combined with the formula derivation and simulation results,the power quality control measures are given.The effectiveness and rationality of the proposed treatment measures are verified by the follow-up real-time monitoring.

关 键 词:电能质量 电压波动和闪变 ETAP仿真 电压谐波含有率和谐波电流 

分 类 号:TM711[电气工程—电力系统及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象