检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:马竟成 丰慧 卢婷 MA Jingcheng;FENG Hui;LU Ting(Hangzhou South Drainage Engineering Construction Management Service Center,Hangzhou 310016,China;School of Economics&Management,Nanjing Institute of Technology,Nanjing 211167,China;Business School of Hohai University,Nanjing 211100,China)
机构地区:[1]杭州市南排工程建设管理服务中心,杭州310016 [2]南京工程学院经济与管理学院,南京211167 [3]河海大学商学院,南京211100
出 处:《建筑设计管理》2024年第3期48-57,共10页Architectural Design Management
基 金:江苏省社会科学基金项目:“双碳”目标下数字赋能江苏水生态协同治理路径与机制研究(23GLD006);南京工程学院引进人才科研启动基金项目:多方协同下长江水生态治理龙头企业特殊社会责任实现的合作机制与对策研究(YKJ202321)。
摘 要:总包项目造价改革是一项长期的系统工作,针对总包项目现行造价管理体系已经不能完全适应造价改革的需要,分析总包项目造价管理现状、困境,并提出相应的突破点是各方关注的焦点。分析现行总包项目造价管理现状和困境。在此基础上,研究并提出造价改革背景下总包项目造价管理的突破点。研究结果表明,造价改革背景下总包项目造价管理的突破点包括发挥市场的主导作用、发挥政府的调控职能、科学确定造价控制基线、实现全过程的造价控制、完善造价管理的基础。研究成果为指导总包项目造价改革工作,提升造价改革效果提供参考。Cost reform for EPC projects is a long-term systematic task.Under the circumstance that the existing cost management system of EPC projects can no longer perfectly adapt to the needs of cost reform,this study probed into current situations and difficult positions of EPC project cost management and pointed out that corresponding breakthrough points became a focus of attention of all relevant parties.Based on analyzing current situations and difficult positions of the existing EPC project cost management,breakthrough points of EPC project cost management were investigated and raised under the cost reform background.As proved by research results,breakthrough points for EPC project cost management in the context of cost reform should consist of exerting the leading role of the market,giving play to the regulatory function of the government,scientifically identifying the baseline of cost control,realizing whole-process cost control and improving the basis for cost management.It is expected that corresponding research achievements can be used for reference in the process of guiding EPC project cost reform and boosting cost reform effects.
关 键 词:工程总承包模式 造价改革背景 造价管理 困境 突破点
分 类 号:TU723.3[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.137.41.2