红沙泉露天矿地表筛分厂对西端帮边坡稳定性影响  

Influence of surface screening plant on the stability of west end slope in Hongshaquan Open-pit Mine

在线阅读下载全文

作  者:韩勇 HAN Yong(CHN Energy Group Xinjiang Energy Co.,Ltd.,Urumchi 830000,China)

机构地区:[1]国家能源集团新疆能源有限责任公司,新疆乌鲁木齐830000

出  处:《煤炭工程》2024年第5期101-106,共6页Coal Engineering

基  金:国家重点研发计划专项(2022YFF1303302)。

摘  要:为了研究红沙泉露天矿地表筛分厂对西端帮边坡稳定性影响,采用Bishop边坡稳定性计算方法,分别以施加地表载荷和无地表载荷为对比,探索了地表筛分厂对西端帮边坡上部、下部影响的局部稳定性规律及对西端帮边坡整体稳定性影响规律。结果表明:当上部局部边坡地表荷载增大时,边坡受到的影响较小,所以更应关注地表荷载对下部局部边坡及整体边坡稳定性的影响。在地表筛分厂的设备重量、储煤量以及设备运输等总重量不超过500 t并位于距离坡顶55 m的条件下,整体边坡的稳定性未受到地表荷载的影响,但下部局部边坡的稳定性略有降低。In order to study the influence of surface screening plant on the stability of the west end slope of Hongshaquan Open-pit Mine,the Bishop slope stability calculation method was used to explore the local stability law of the influence of surface screening plant on the upper and lower parts of the west end slope and the overall stability law by comparing the surface load and non-load respectively.The results show that when the surface load of the upper part slope increases,the slope is less affected,so more attention should be paid to the influence of surface load on the stability of the lower part slope and the whole slope.When the total weight of the surface screening plant,coal storage and equipment transportation does not exceed 500t and is located 55 m away from the top crest of the slope,the stability of the overall slope is not affected by the surface load,but the stability of the lower part of the slope is slightly reduced.

关 键 词:露天煤矿 地表建筑物 边坡稳定性 极限平衡理论 数值模拟 地表荷载 

分 类 号:TD804[矿业工程—矿山开采]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象