检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:沈韬 刘斌 李青山 杨成 严石友 韩绍康 杨阳[3] SHEN Tao;LIU Bin;LI Qingshan;YANG Cheng;YAN Shiyou;HAN Shaokang;YANG Yang(Kunming Metro Construction Management Co.,Ltd.,Kunming 650051,China;China Railway No.2 Engineering Group Co.,Ltd,Chengdu,610036,China;School of Civil Engineering,Chongqing University,Chongqing 400045,China)
机构地区:[1]昆明地铁建设管理有限公司,昆明650051 [2]中铁二局集团有限公司,成都610036 [3]重庆大学土木工程学院,重庆400045
出 处:《兰州交通大学学报》2024年第3期10-19,共10页Journal of Lanzhou Jiaotong University
基 金:国家自然科学基金(52108300)。
摘 要:宁波地区主要以海相淤泥质黏土或淤泥等软土为主,此类土具有含水量大、压缩性高、承载力低的特性,地铁围岩开挖施工面临垮塌、变形问题,冻结法施工往往是处理上述问题的有效方法。然而,地层解冻后注浆作业不及时、注浆效果差极易导致地层沉降,所以需要对地基沉降进行长期监测。为更好考虑软土地基下的隧道安全,以宁波句章路站-鄞州客运总站站-南部商务区站区间盾构隧道为例,采用冻结法对宁波句章路站-鄞州客运总站站区间1#联络通道进行施工,开展冻融工后联络通道长期运营沉降预测研究,并通过三维有限软件MIDAS/GTS建模,对其冻融沉降进行计算分析。根据布点及实时观测,对隧道及句鄞区间盾构隧道及1#联络通道开挖施工期间的结构沉降变形及长期运营沉降变形进行预测,预测结果与监测数据基本一致,对于软土地基冻融处理具有重要工程意义,同时也可为相关工程提供借鉴。Ningbo area is mainly composed of marine silty clay or silt and other soft soil,which has the characteristics of large water content,high compressibility,low bearing capacity.Surrounding rock excavation during subway con-struction is usually faced with collapse,deformation problems,the freezing method is often an effective way to deal with the above problems.Therefore,freezing method is widely used in the construction of urban subway projects in such silty strata.However,after thawing the ground,the grouting operation is not timely and the grouting effect is poor,which is easy to lead to the formation settlement,so it is necessary to carry out long-term monitoring of the foundation settlement.In order to better consider the tunnel safety under soft soil foundation,taking the shield tunnel between Ningbo Guzhanglu Station-Yinzhou Terminal Station-Southern Business District station as an example,a-dopts freezing method to construct the No.1 contact channel between Ningbo Guzhanglu Station and Yinzhou Termi-nal Station,and carries out the research on the long-term operating settlement prediction of the contact channel after freezing-thawing construction.The settlement was calculated and analyzed by MIDAS/GTS modeling.Based on the distribution and real-time observation,the structure settlement deformation and long-term operation settlement de-formation during the excavation of the tunnel and the Yingrong section of shield tunnel and the 1#contact channel are predicted.The predicted results are basically consistent with the monitoring data,which has important engineer-ing significance for freeze-thaw treatment of soft soil foundation,and can also provide reference for related projects.
关 键 词:软土地基 冻结法施工 冻融沉降 沉降预测 MIDAS/GTS建模
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7