检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:付伟 FU Wei(Sinohydro Bureau 10 Co.,LTD.,Chengdu Sichuan 610036)
机构地区:[1]中国水利水电第十工程局有限公司,四川成都610036
出 处:《四川水力发电》2024年第3期5-7,15,共4页Sichuan Hydropower
摘 要:印度尼西亚巴塘水电站调压井所处位置地质条件较差,岩体以全风化地层为主,开挖阶段初期支护安全风险大。项目部经过多种方案对比,最终选择了“灌注桩+冠”、“环梁+锚喷”的支护方式。阐述了对全风化地层情况下调压井的开挖与支护采用的设计方案和施工方法进行的研究与实施,取得了较好的效果,所取得的经验可为后续类似工程施工时参考。The surge tank of Batang Toru Hydropower Plant in Indonesia is mainly composed of completely weathered strata with poor geological conditions,and there is a high risk of support safety during the early excavation stage.After comparing multiple schemes,the final scheme is to use the support method of“bored pile+crown”,“ring beams+anchor”and shotcrete.This article introduces the excavation and support scheme and construction method of surge tank in completely weathered formation,providing a certain reference for the construction of similar projects in the future.
分 类 号:TV7[水利工程—水利水电工程] TV52TV554
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7