巴塘水电站全风化地层调压井开挖与支护方案研究  

Overview of Excavation and Support Scheme for Surge Tank in Fully Weathered Stratum of Batang Toru Hydropower Plant

在线阅读下载全文

作  者:付伟 FU Wei(Sinohydro Bureau 10 Co.,LTD.,Chengdu Sichuan 610036)

机构地区:[1]中国水利水电第十工程局有限公司,四川成都610036

出  处:《四川水力发电》2024年第3期5-7,15,共4页Sichuan Hydropower

摘  要:印度尼西亚巴塘水电站调压井所处位置地质条件较差,岩体以全风化地层为主,开挖阶段初期支护安全风险大。项目部经过多种方案对比,最终选择了“灌注桩+冠”、“环梁+锚喷”的支护方式。阐述了对全风化地层情况下调压井的开挖与支护采用的设计方案和施工方法进行的研究与实施,取得了较好的效果,所取得的经验可为后续类似工程施工时参考。The surge tank of Batang Toru Hydropower Plant in Indonesia is mainly composed of completely weathered strata with poor geological conditions,and there is a high risk of support safety during the early excavation stage.After comparing multiple schemes,the final scheme is to use the support method of“bored pile+crown”,“ring beams+anchor”and shotcrete.This article introduces the excavation and support scheme and construction method of surge tank in completely weathered formation,providing a certain reference for the construction of similar projects in the future.

关 键 词:调压井 全风化 开挖支护 施工方案 巴塘水电站 

分 类 号:TV7[水利工程—水利水电工程] TV52TV554

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象