检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:乔建岗 QIAO Jiangang(China Railway 16th Bureau Group Road and Bridge Engineering Co.Ltd.,Beijing 101500,China)
机构地区:[1]中铁十六局集团路桥工程有限公司,北京101500
出 处:《铁道建筑技术》2024年第6期168-170,196,共4页Railway Construction Technology
摘 要:在隧道建设穿越溶洞尤其是特大型溶洞过程中,选择合理的跨越结构至关重要。本文以某隧道跨特大型竖井溶洞段为依托,基于有限差分软件FLAC^(3D),研究隧道桩基承台跨越结构力学响应,并对其稳定性进行分析。结果表明:跨越结构应力主要集中于和围岩接触部位的桩基下部及承台边缘,应进一步提升桩基承台结构与围岩的连接强度;桩基承台结构右侧承台边缘区域位移超出安全控制指标预警值,应加强该区域监测以保障施工安全,必要时采取强化措施。In the process of tunnel construction through caves,especially super large karst caves,it is very important to choose a reasonable spanning structure.In this paper,based on FLAC^(3D) finite difference software,the mechanical response of the pile foundation bearing platform spanning structure of a tunnel is studied and its stability is analysed based on the section of a tunnel spanning a super large karst cave.The results show that:the stress of the spanning structure is mainly concentrated in the lower part of the pile foundation and the edge of the bearing platform in the contact area with the surrounding rock,and the strength of the connection between the pile foundation bearing platform structure and the surrounding rock should be further improved;the displacement of the right side of the pile foundation bearing platform structure in the edge area of the bearing platform exceeds the warning value of the safety control indexes,so the monitoring of this area should be strengthened to ensure the safety of the construction and the reinforcing measures should be taken when necessary.
关 键 词:隧道工程 特大型溶洞 桩基承台 数值模拟 力学响应
分 类 号:U455.4[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7