检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:贾绍明[1] 王啟铜 宋神友 金文良 付佰勇 陈卓杰 JIA Shaoming;WANG Qitong;SONG Shenyou;JIN Wenliang;FU Baiyong;CHEN Zhuojie(Department of Transportation of Guangdong Province,Guangzhou 510101,China;Shenzhen-Zhongshan Link Administration Center,Guangzhou 510600,China;CCCC Highway Bridges National Engineering Research Center Co.,Ltd.,Beijing 100088,China;Research Center of Coastaland Urban Geotechnical Engineering,Zhejiang University,Hangzhou 310058,China)
机构地区:[1]广东省交通运输厅,广东广州510101 [2]深中通道管理中心,广东广州510600 [3]中交公路长大桥建设国家工程研究中心有限公司,北京100088 [4]浙江大学滨海和城市岩土工程研究中心,浙江杭州310058
出 处:《西安建筑科技大学学报(自然科学版)》2024年第2期229-237,共9页Journal of Xi'an University of Architecture & Technology(Natural Science Edition)
基 金:广东省重点领域研发计划项目(2019B111105002)。
摘 要:深中通道是国内首次大规模使用水下深层水泥搅拌桩处理沉管隧道地基的超级工程,具有碎石垫层厚度大、深层水泥搅拌桩置换率高等特点,目前相关研究较少.为了研究厚垫层和高置换率深层水泥搅拌桩复合地基的沉降变形规律,在现场荷载板试验结果的基础上,将碎石垫层、复合地基和桩端全风化岩层视为一个共同作用的系统,假设在桩土分界面处桩土位移模式非同步,同一深度处桩间土体的位移模式非协调,考虑系统各部分在交界面上应力和变形连续,通过对典型单元体的分析,推导了复合地基桩土应力比和沉降的求解公式,最后将计算结果与现场荷载板试验结果和传统方法进行了对比验证.研究结果表明:本文方法计算所得沉降与实测沉降相比误差在8.0%以内,计算精度优于传统方法,并且沉降随荷载的变化趋势大体相同,说明本文方法能较好反映沉管隧道复合地基的沉降特性;根据本文方法计算得到的桩土应力比与实测桩土应力比相比误差在-7.0%以内,可以认为理论计算的结果可靠.The Shenzhen-Zhongshan Link is the first super project in China to use underwater deep cement mixing pile to treat the foundation of immersed tunnel on a large scale,and it has the characteristics of large gravel cushion thickness and high replacement rate of deep cement mixing piles.At present,there are few relevant studies.In order to study the settlement deformation law of thick cushion and deep cement mixing pile composite foundation with high replacement rate,on the basis of the field load plate test results,the gravel cushion,composite foundation and completely weathered rock at the pile end were considered as a joint action system.Assuming that the displacement mode of pile and soil at the pile soil interface is not synchronous,and the displacement mode of soil between piles at the same depth is not coordinated,and considering that the stress and deformation of each part of the system are continuous at the interface,the formulas for calculating the pile-soil stress ratio and settlement of composite foundation were derivedthrough the analysis of typical elements.Finally,the results were compared with the field load plate test results andtraditional method.The results show that the error between the settlement calculated by this method and the measured settlement is less than 8%,the calculation accuracy is better than the traditional method,and the change trend of settlement with load is basically the same,indicating that the method in this paper can better reflect the settlement characteristics of composite foundation of immersed tube tunnel.The error between the pile-soil stress ratio calculated by this method and the measured pile-soil stress ratio is within-7%,which can be considered as reliable.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:160.79.109.31