检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:徐晨轩 张政凯[1] 万青[1] XU Chenxuan;ZHANG Zhengkai;WAN Qing(General Irrigation Canal Management Office of Jiangsu Province,Huai’an 223211,China)
出 处:《中国水能及电气化》2024年第6期34-40,共7页China Water Power & Electrification
摘 要:依据淮河入海水道通榆河立交工程测压管观测实际数据,结合绘制图表对测压管测量成果进行分析,旨在积累经验提升测压管监测分析和管理能力。分析成果可为工程安全运行管理提供技术支持,也可为相关工程测压管观测与分析提供参考。Based on the actual data from piezometer tube observations of the Tongyu River Interchange Project in the Huaihe River Estuary,this paper analyzes the measurement results using charts and diagrams,aiming to accumulate experience to enhance the monitoring,analysis,and management capabilities of piezometer tubes.The analysis results can provide technical support for the safe operation and management of the project and also serve as a reference for piezometer tube observation and analysis in related projects.
分 类 号:TV698.1[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49