解决现有夹片更换效率低的新型提升千斤顶设计  

New lifting jack design to solve the low efficiency of the existing clip replacement

在线阅读下载全文

作  者:梁涛 郭世滔 谢诗 严李荣 LIANG Tao;GUO Shitao;XIE Shi;YAN Lirong(Liuzhou Overwem Machinery Co.,Ltd.,Liuzhou 545000,China)

机构地区:[1]柳州欧维姆机械股份有限公司,广西柳州545000

出  处:《中国高新科技》2024年第9期17-19,共3页

摘  要:文章对现有千斤顶夹片更换效率低下的问题进行研究。通过优化顶松夹紧部件设计并创新性引入顶压回程套、双向联动油缸组件及可拆卸连接设计,实现更高效地提升夹片更换,以及加快施工进度和增强施工安全性。该设计具有良好的行业应用前景,在推广潜力及经济效益等方面都有很好的表现。对促进工程建设效率的提高具有重要的实际意义,目前已在工程中推广和应用。This paper investigates the low efficiency of the existing jack clip replacement.By optimizing the design of the top release clamping parts and introducing innovative top pressure return sleeves and two-way linkage cylinder assemblies,as well as detachable connection designs,more efficient clamping changes,improved construction schedules and enhanced construction safety are achieved.The design has a good prospect in industry application,and has a good performance in promotion potential and economic benefits.Therefore,the design has important practical significance to promote the improvement of engineering construction efficiency.At present,this design has been popularized and applied in the project.

关 键 词:提升千斤顶 夹片更换 顶压回程套 双向联动油缸组件 可拆卸连接设计 

分 类 号:TH211[机械工程—机械制造及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象