检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘亚军 LIU Yajun(Yunnan Huadian Ludila Hydropower Co.,Ltd.,Kunming 650228,China)
机构地区:[1]云南华电鲁地拉水电有限公司,云南昆明650228
出 处:《云南水力发电》2024年第6期48-50,共3页Yunnan Water Power
摘 要:水轮发电机组转动部分拆卸与回装是机组A修的重要工序,直接影响检修工期。以鲁地拉水电站为例针对机组转动部分各段主轴拆卸及回装工艺进行优化,缩短水轮发电机组A修工期,提高检修效率,为机组检修提供经验和参考。The disassembly and reinstallation of the rotating part of water turbine generator set is an important process for Unit A maintenance,which directly affects the maintenance schedule.Taking Ludila Hydropower Station as an example,this paper optimizes the disassembly and reinstallation process of each section of the main shaft in the rotating part of unit.It can shorten the maintenance period of hydroelectric generator unit A,improve maintenance efficiency,and provide experience and reference for unit maintenance.
分 类 号:TK730.8[交通运输工程—轮机工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.177