检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:赵志巅 杨怀明 ZHAO Zhidian;YANG Huaiming(Huadian Yunnan Power Generation Co.,Ltd.,Lvshuihe Power Plant,Gejiu 661014,China)
机构地区:[1]华电云南发电有限公司绿水河发电厂,云南个旧661014
出 处:《云南水力发电》2024年第6期65-67,共3页Yunnan Water Power
摘 要:随着碳中和、碳达峰目标的提出,我国新能源进入了高速发展的快车道中。光伏场站也随之发展,针对于云南多为山地的地理条件,导致光伏区较为分散,从光伏区的电能传输至升压站过程中,必然需要通过地埋与架空线路相结合,这也直接导致了上塔部分的隔离式熔断器在运行过程中出现各种故障,导致电能不能正常地传输。文章针对某光伏电站35 kV集电线路隔离式熔断器在运行过程中常见的故障进行分析和归纳,并提出对应的解决办法,旨在对光伏电站35 kV集电线路隔离式熔断器故障进行交流。With the proposal of carbon neutrality and carbon peak goals,China's new energy has entered a fast lane of rapid development.Photovoltaic power stations have also developed accordingly.Yunnan is mostly mountainous in geographical conditions,resulting in scattered photovoltaic areas.The transmission of electricity from the photovoltaic area to the booster station inevitably requires a combination of buried and overhead lines.This also directly led to various faults in the isolation fuse of the upper tower during operation,resulting in the inability to transmit electrical energy normally.This paper analyzes and summarizes the common faults of 35 kV collector line isolation fuse in a photovoltaic power station during operation,and proposes corresponding solutions.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7