电力工程铁塔攀登或转位防高坠安全防护措施  

Safety Protection Measures to Prevent Falling From HeightsDuring Power Engineering Tower Climbing or Repositioning

在线阅读下载全文

作  者:李国栋 LI Guodong(Ningxia Power Transmission and Transformation Engineering Co.,Ltd.,Yinchuan,Ningxia Hui Autonomous Region,750001 China)

机构地区:[1]宁夏送变电工程有限公司,宁夏银川750001

出  处:《大众科学》2024年第5期91-93,共3页China Public Science

摘  要:高处坠落属于一种发生频率较高的事故类型,主要是在电力工程铁塔攀登或转位过程中,由于安全防护不到位和人员误操作而引起的。对电力工程铁塔攀登或转位过程中作业安全设施使用时存在的问题进行了分析,以技术要求、安全规定为依据,对现有防高坠安全防护措施进行了优化与完善,以期为电力人员合理使用防坠装置和做好铁塔攀登、转位时的安全防护提供参考。Falling from a height is a high-frequency type of accident,which is mainly caused by inadequate safety protection and personnel's misoperation during power engineering tower climbing or repositioning.This article first analyzes the problems existing in the use of operation safety facilities during power engineering tower climbing or repositioning,and then based on technical requirements and safety regulations,optimizes and improves existing antifalling safety protection measures,in order to provide reference for power personnel to reasonably use anti-falling devices and do a good job in safety protection during tower climbing and repositioning.

关 键 词:电力铁塔 攀登或转位 高空作业 防高坠 

分 类 号:TM75[电气工程—电力系统及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象