旭龙水电站施工总布置优化研究  

Optimization Study of the General Construction Layout of Xulong Hydropower Station

在线阅读下载全文

作  者:吴楠 喻文振 陈曦 WU Nan;YU Wenzhen;CHEN Xi(China Energy Investment Group Jinsha River Xulong Hydropower Co.,Ltd.,Ganzi Sichuan 627950;Changjiang Survey,Planning,Design and Research Co.,Ltd.,Wuhan Hubei 430010)

机构地区:[1]国家能源集团金沙江旭龙水电有限公司,四川甘孜627950 [2]长江勘测规划设计研究有限责任公司,湖北武汉430010

出  处:《四川水力发电》2024年第2期103-107,共5页Sichuan Hydropower

摘  要:水电工程多位于深山峡谷,地形地质条件复杂,施工场地狭小,建设周期长,不可控因素多等。可研阶段开展了施工总布置规划,但项目实施过程中建设单位需要结合实际条件组织对施工布置方案优化调整,形成最终的施工总布置方案。笔者总结了旭龙水电站在施工总布置优化方面开展工作,可为类似工程建设提供参考借鉴。Hydropower projects are mostly located in deep mountains and the gorges with complex terrain and geological conditions,small construction sites,long construction periods and many uncontrollable factors.Although the general layout was carried out in the feasibility study stage of the project,the construction unit should organize optimization and adjustment of the construction layout scheme in the implementation process according to the actual situation to form the final scheme.This study summarizes the work of general construction layout optimization of Xulong Hydropower Station,which can provide reference for the construction of similar projects.

关 键 词:施工总布置 场内交通 渣场 施工场地 优化研究 

分 类 号:TV511[水利工程—水利水电工程] TU733[建筑科学—建筑技术科学]

 