检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:闫培雷[1,2] 郭恩栋 余世舟[1,2] 孙得璋 于天洋[3,4] YAN Peilei;GUO Endong;YU Shizhou;SUN Dezhang;YU Tianyang(Key Laboratory of Earthquake Engineering and Engineering Vibration,Institute of Engineering Mechanics,China Earthquake Administration,Harbin 150080,China;Key Laboratory of Earthquake Disaster Mitigation,Ministry of Emergency Management,Harbin 150080,China;Guangdong Earthquake Agency,Guangzhou 510070,China;Guangdong Earthquake Disaster Risk Control and Prevention Center,Guangzhou 510070,China)
机构地区:[1]中国地震局工程力学研究所地震工程与工程振动重点实验室,黑龙江哈尔滨150080 [2]地震灾害防治应急管理部重点实验室,黑龙江哈尔滨150080 [3]广东省地震局,广东广州510070 [4]广东省震灾风险防治中心,广东广州510070
出 处:《地震工程与工程振动》2024年第3期223-230,共8页Earthquake Engineering and Engineering Dynamics
基 金:中国地震局工程力学研究所基本科研业务费专项资助项目(2021B06,2021C05);黑龙江省自然科学基金联合引导项目(LH2021E122)。
摘 要:2023年12月18日甘肃省积石山县发生6.2级地震,造成当地各类工程结构发生不同程度的破坏,导致了重大人员伤亡。基于调查资料,总结了供水系统中的建(构)筑物、设施设备和供水管网的震害特征。研究表明:经过正规抗震设计和施工的建筑物震害较轻,表明我国抗震设计规范发挥了积极作用;低烈度区水厂设施设备因地震破坏而停运,个别设备漏油污染了水质,进而导致了供水能力下降;位于高烈度区的供水管网在老旧钢质管道连接处发生多处破坏,出现了水量不足、水压降低的情况,给居民生活造成了不利影响。最后,从采取设备减隔震技术、管道和设备接口采用柔性连接、选择供水管道材质、全面开展管网漏损排查等四个方面提出了恢复重建的建议。The M_(s)6.2 magnitude earthquake that struck Jishishan County,Gansu Province,on December 18,2023,caused varying levels of damage to different engineering structures in the region,resulting in significant casualties.In order to study the impact on the water supply system,based on the investigation data,the seismic damage characteristics of buildings,structures,facilities,equipments,and water supply pipeline networks were summarized.The study revealed that structures designed and constructed to be earthquake-resistant experienced relatively minor damage,highlighting the effectiveness of China’s earthquake-resistant design standards.The water plant located in the low-intensity zone was shut down as a result of the earthquake,with oil leakage from certain equipment leading to water contamination and a reduction in water supply capacity.Additionally,the water supply pipeline network in the high-intensity zone sustained multiple damages at the connections of the old steel pipelines,resulting in water shortage and reduced water pressure that adversely impacted residents’lives.Finally,four recommendations for recovery and rebuilding were proposed,including the adoption of seismic isolation techniques for equipments,the use of flexible connections for pipe-equipment interfaces,the selection of water supply pipe materials,and the conduct of a comprehensive leakage survey of the pipe network.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49