检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张譍之 孙惠斌[1,2] 颜诚 况侨 ZHANG Yingzhi;SUN Huibin;YAN Cheng;KUANG Qiao(Key Laboratory of High Performance Manufacturing for Aero Engine,Ministry of Industry and Information Technology,Northwestern Polytechnical University,Xi'an 710072,China;Institute for Aero-engine Smart Assembly of Shaanxi Province,Northwestern Polytechnical University,Xi'an 710072,China;South Industry Company Limited,Aero Engine Corporation of China,Zhuzhou Hunan 412002,China;Military Representative Office of Army Equipment Department of the People's Liberation Army in Zhuzhou,Zhuzhou Hunan 412002,China)
机构地区:[1]西北工业大学航空发动机高性能制造工业和信息化部重点实验室,西安710072 [2]西北工业大学陕西省"四主体一联合"航空发动机智能装配技术校企联合研究中心,西安710072 [3]中国航发南方工业有限公司,湖南株洲412002 [4]中国陆装驻株洲地区航空军事代表室,湖南株洲412002
出 处:《航空动力学报》2024年第7期56-65,共10页Journal of Aerospace Power
基 金:国家科技重大专项(2017-Ⅶ-0010-0104);基础科研计划(XXXX2018213A001)。
摘 要:为了有效提高短精密螺栓连接结构的装配精度,分析了两级盘组合后形心、质心偏心影响因素,阐述了两级盘配合过程中的平动转动行为和定心原理,建立了两级转子形心偏差预测模型、初始不平衡量预测模型.提出了以短精密螺栓连接的转子盘安装相位为变量,形心偏心和初始不平衡量最小为优化为目标的工艺优化模型,通过实物实验进行了验证.结果表明:形心偏差模长最大相对误差为13.28%,组合不平衡量的计算结果精度最大提高了 37.3%,工艺优化结果与实验结果相符,对于短精密螺栓连接结构装配工艺优化具有重要的参考意义.In order to effectively improve the assembly accuracy of the short precision bolted connection structures,the influencing factors of the centroid and centroid eccentricity after combination of the two-stage disks were analyzed,the translational rotation behavior and centering principle during the matching process of the two-stage disks were expounded,and a two-stage rotor was established.Centroid deviation prediction model and initial imbalance prediction model were established.A process optimization model was proposed,the installation phase of the rotor disk connected by short precision bolts was taken as the variable,and the centroid eccentricity and the mini-mum initial unbalance amount were taken as the optimization objective,which were verified by the physical test.The results showed that the maximum relative error of the module length of the centroid deviation was 13.28%,the maximum accuracy of the calculation result of the combined unbalance increased by 37.3%,and the process optimization results were consistent with the test results,which had important reference significance for the optimization of the assembly process of short precision bolted connection structures.
关 键 词:短精密螺栓 同心度 不平衡量 安装相位 工艺优化
分 类 号:V263.2[航空宇航科学与技术—航空宇航制造工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.129.58.166