峡谷高墩箱梁斜腹板模板安装质量控制  

Installation Quality Control of Web Formwork of Box Girder for High Pier in Canyon Region

在线阅读下载全文

作  者:张宏刚 黑世强 邓智文 ZHANG Hong-gang;HEI Shi-qiang;DENG Zhi-wen(CCCC-SHEC Fourth Engineering Company Limited,Wuhu 241000,China;China Road and Bridge Corporation,Beijing 100011,China)

机构地区:[1]中交二航局第四工程有限公司,芜湖市241000 [2]中国路桥工程有限责任公司,北京市100011

出  处:《公路》2024年第2期44-48,共5页Highway

摘  要:MORACICA大桥地处的大峡谷是本区域的过风通道,常年有较大风力,尤其是冬春季节常有7~8级风,甚至可达11级。并且3号墩墩身最高为161.m,1号墩0号块高10.5m,2号~5号墩0号块高11.5m。恶劣天气与高墩给模板施工带来了严峻的考验。通过介绍MORACICA大桥如何在施工安全、优质高效的情况下顺利完成箱梁斜腹板模板安装的相关施工技术和经验,并通过方案比选、施工优化、过程控制等方面叙述,总结了高墩箱梁斜腹板模板安装中对模板线形、模板斜率、斜腹板顶面标高及结构稳定性的控制措施,为高墩箱梁斜腹板施工提供借鉴经验。The MORACICA Bridge is located in a grand canyon where is a wind channel and with great wind all the year round,especially in the winter and spring season,the wind can reach force 7-8 level even up to 1l gale.The highest bridge Pier#3 is 16lm high,and that of pier#0 block for Pier#1 is 10.5m,and for Pier#2-#5 is 11.5m.The severe weather and high piers have brought ordeal to formwork construction.The construction technology and experience of inclined web template installation of the box girders for the MORACICA Bridge are introduced with the requirements of ensuring construction safety,quality and efficiency,and through elaborations on schemes comparison,construction optimization,process control and so on,controlling measures during the installation of inclined web slab formwork for high pier are concluded in terms of linearity,inclination ratio,elevation of inclined web slab surface and web structure stability,so as to provide reference for high pier box girder inclined web construction.

关 键 词:桥梁工程 箱梁斜腹板 模板线形 模板标高 模板斜率 结构稳定性 安装质量控制 

分 类 号:U445.33[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象