强风环境下单肢-双肢变截面高墩施工关键技术  

Discussions on the Key Technologies of Construction of High Pier with Variable Section under Strong Wind

在线阅读下载全文

作  者:邹振 李冰 ZOU Zhen;LI Bing(CCCC-SHEC Fourth Engineering Company Limited,Wuhu 241000,China)

机构地区:[1]中交二航局第四工程有限公司,芜湖市241000

出  处:《公路》2024年第2期58-63,共6页Highway

摘  要:MORACICA大桥桥墩采用单肢一双肢变截面形式,最高墩高达161m,施工采用液压自爬模施工工艺。该桥位于大峡谷处,该峡谷是本区域的过风通道,常年有较大风力,尤其是冬春季节风力达到7~8级,有时可达11级。因此,墩身施工中要着重考虑大风天气对爬模施工的影响。依托黑山南北高速公路项目MORACICA大桥高墩施工,讨论在强风恶劣环境下高墩施工时所采取的关键技术措施。The pier of MORACICA Bridge adopts the form of variable cross section of one limb-two limbs,and the highest of which is 16lm.In this project,the construction technology of hydraulic self-climbing formwork is applied.The Moracica Bridge is located in a grand canyon where is a wind channel and with great wind all the year round,especially in the winter and spring season,the wind can reach force 7-8 level even up to ll gale.Therefore,the effect of wind on the hydraulic self-climbing formwork technology should be considered during the construction of the pier.In the paper,relying on the construction of pier of Moracica Bridge in Montenegro North-South Highway Project,the key technical measures adopted in the construction of high pier in severe wind environment are discussed.

关 键 词:桥梁工程 高墩施工 强风环境 单肢-双肢变截面 施工关键技术 

分 类 号:U443.22[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象