检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘欣怡 胡中波 王钦科 田德帅 刘畅博 李阔 Liu Xinyi;Hu Zhongbo;Wang Qinke;Tian Deshuai;Liu Changbo;Li Kuo(Chengdu Engineering Corporation Limited,Chengdu 611130,China;PowerChina Institute of Water Resources and Hydropower Research,Beijing 100120,China;School of Civil Engineering and Architecture,Southwest University of Science and Technology,Mianyang 621010,China)
机构地区:[1]中国电建集团成都勘测设计研究院有限公司,成都611130 [2]水电水利规划设计总院,北京100120 [3]西南科技大学土木工程与建筑学院,绵阳621010
出 处:《太阳能学报》2024年第6期637-645,共9页Acta Energiae Solaris Sinica
基 金:中国电建集团成都院自主项目(P48521,P43919)。
摘 要:以福建海域风电场中使用钢管-混凝土组合桩的嵌岩群桩高承台基础为研究对象,通过室内缩尺模型试验的方法,对嵌岩群桩基础的竖向抗压承载特性和破坏机理进行研究,并与嵌岩单桩基础进行对比。研究结果表明:加载前期,钢管-混凝土组合桩群桩之间的覆盖层和基岩与桩作为一个整体共同承载来自上部的下压荷载,这导致了群桩的桩端轴力增加幅度相对单桩较小,以及群桩的桩端阻力发挥受限,向下的应力较单桩更难扩散;加载后期,群桩之间出现连接裂缝,削弱了桩间土的承载能力,使得群桩的桩端阻力和端阻比增加明显。此外,为避免群桩效应的影响,钢管-混凝土组合桩的桩间距应在3倍桩直径以上。Taking the high cap foundation of rock-socketed pile group using concrete filled steel tubular composite pile in Fujian offshore wind farm as the research object,the vertical compressive bearing characteristics and failure mechanism of rock-socketed pile group were studied by scale model test,and compared with rock-socketed single pile.The results show that in the early stage of loading,the overburden and bedrock between the concrete filled steel tubular composite pile group and the pile as a whole bear the upper compressive load together,which leads to the smaller increase of the axial force at the pile end of the pile group than that of the single pile,and the resistance at the pile end is limited,the downward stress is more difficult to diffuse than that of the single pile.In the later stage of loading,the connection cracks appear between the piles,which weakens the bearing capacity of the soil between the piles,and makes the pile end resistance and end resistance ratio of the pile group increase obviously.In addition,in order to avoid the influence of pile group effect,the pile spacing of concrete filled steel tubular composite piles should be above 3 times the pile diameter.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.249