检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:秦湜 孟珊[1] 吴红波[1] 张来喜 祝海锋 QIN Shi;MENG Shan;WU Hong-bo;ZHANG Lai-xi;ZHU Hai-feng(South China Branch of China Construction Second Engineering Bureau Co.Ltd.,Shenzhen 518000,China)
机构地区:[1]中国建筑第二工程局有限公司华南分公司,广东深圳518000
出 处:《工程建设与设计》2024年第12期207-209,共3页Construction & Design for Engineering
摘 要:研究了建筑施工总承包项目中消防设施施工的全过程管理,探讨了设计阶段、施工准备阶段以及施工过程的质量管理策略,阐述了建筑施工总承包项目中,消防设施施工的文档与记录管理,以及风险管理的相关内容。This paper studies the whole process management of fire fighting facilities construction in the general contract project of building construction,discusses the quality management strategy of design stage,construction preparation stage and construction process,and expounds the document and record management of fire fighting facilities construction in the general contract project of building construction,as well as the related content of risk management.
分 类 号:TU712.3[建筑科学—建筑技术科学] TU892
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7