检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:孙建元 SUN Jianyuan(Gansu Chunlin Engineering Consulting Co.,Ltd.,Lanzhou 730050,China)
机构地区:[1]甘肃省春林工程咨询有限公司,甘肃兰州730050
出 处:《兰州工业学院学报》2024年第3期55-58,共4页Journal of Lanzhou Institute of Technology
摘 要:为更精准快地进行工程量清单模式下的建筑工程竣工结算审核,结合某工程项目,通过分析结算审计中通常存在的问题,从审核流程、核减原因、项目质量等方面对建筑工程结算审核策略进行阐述。该项目的结算审核结果可为同类项目结算审核工作提供参考。In order to conduct the completion settlement audit of construction projects in the mode of bill of quantities more accurately and quickly,based on the analysis of the common problems in the settlement audit of a certain project,this paper expounds the audit strategy of the settlement of construction projects from the aspects of the audit process,the reasons for the reduction and the quality of the project.The results of the settlement audit of this project can provide reference for similar settlement audit projects.
分 类 号:TU723.3[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7