检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:黄红梅 HUANG Hongmei(Guangdong Hydropower Second Bureau Group Co.,Ltd.,Guangzhou 511340,China)
出 处:《广东水利水电》2024年第6期95-99,共5页Guangdong Water Resources and Hydropower
摘 要:本文详细介绍了基于精密三角高程测量的跨河水准测量施测过程及计算原理,通过同时对向观测消除仪器高、地球曲率半径和大气垂直折光对高差的影响,解决了高精度棱镜高差测量问题,并应用于粤东城际铁路“一环一射线”YDZH-8标项目二等高程控制网复测,通过与全线采用传统几何水准测量方法进行对比分析,验证其可行性。In this paper,the measurement process and calculation principle of cross-river leveling based on precision triangulation are introduced in detail.By simultaneously surveying in opposite directions,to eliminate the influence of instrument height,Earth curvature radius,and atmospheric vertical refraction on height difference.And the problem of high precision measurement prism height difference is solved.The method has applied to remeasure the second level control network of YDZH-8 project of“One ring,one ray”of East Guangdong Intercity Railway.And by comparing and analyzing with the whole line using the traditional geometric leveling method,its feasibility was verified.
分 类 号:P224.2[天文地球—大地测量学与测量工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.223.33.204