检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:陈利栋 朱金泉 Chen Lidong;Zhu Jinquan(Sanfang Construction Group Co.,LTD,Hangzhou 310000)
出 处:《设备监理》2024年第3期26-28,42,共4页Plant Engineering Consultants
摘 要:设计联络会是城市轨道交通弱电系统建设过程中的重要环节。监理工程师理清本阶段的监理工作任务,积极介入设计联络会,是做好事前控制的前提。本文结合城市轨道交通弱电系统监理过程中的实际经验,梳理总结了监理过程中遇到的一些常见问题,探讨并提出设计联络会阶段的监理主要工作任务,以期能对弱电系统设备监理工程师的监理工作起到借鉴作用。Design liaison meeting is an important link in the construction process of urban rail transit weak current system.It is a prerequisite for the supervision engineer to make clear the supervision task at this stage and actively participate in the design liaison meeting.Based on the practical experience in the supervision process of the weak current system of urban rail transit,this paper sorted out some common problems encountered in the supervision process,discussed and proposed the main tasks of supervision in the design liaison meeting stage,in order to guide and reference the supervision work of the supervision engineers of the weak current system equipment.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49