检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:慕长斌 Mu Chang-bin
机构地区:[1]中铁建大桥工程局集团第四工程有限公司,哈尔滨150000
出 处:《建筑技术开发》2024年第7期58-61,共4页Building Technology Development
摘 要:山区跨越深切峡谷斜拉桥钢混组合梁施工方案的选择不同于跨域大江大河及海上斜拉桥施工,因其受地形地貌限制问题较为突出。研究以某特大桥为背景,对比分析了采用缆索吊机整节段施工与悬臂拼装桥面吊机整节段施工钢混组合梁斜拉桥在各方面的优缺点,以期为以后施工类似工程提供一定借鉴作用。The selection of steel-concrete composite girder construction scheme of cable-stayed bridge across deep canyon in mountainous area is different from that of cable-stayed bridge across big river and sea,because it is limited by topography and landform.Based on the background of a large bridge,this paper compares and analyzes the advantages and disadvantages of the cable-concrete composite girder cable-stayed bridge constructed by cable crane and cantilever deck crane,in order to provide some reference for the construction of similar projects in the future.
分 类 号:U448.27[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49