深基坑岩土结构化永久支护理论与设计方法  被引量:2

Theory and design method of permanent support for deep foundation pit using structural method of geotechnique

在线阅读下载全文

作  者:李连祥[1,2,3] 李胜群 邢宏侠 侯颖雪 韩志霄 LI Lianxiang;LI Shengqun;XING Hongxia;HOU Yingxue;HAN Zhixiao(School of Civil and Hydraulic Engineering,Shandong University,Jinan 250061,China;Foundation Pit and Deep Foundation Engineering Research Center,Shandong University,Jinan 250061,China;Shandong High-Tech Geotechnical Engineering Co.,Ltd.,Jinan 250102,China)

机构地区:[1]山东大学土建与水利学院,济南250061 [2]山东大学基坑与深基础工程技术研究中心,济南250061 [3]山东高新岩土工程有限公司,济南250102

出  处:《建筑结构》2024年第13期133-140,共8页Building Structure

基  金:国家自然科学基金项目(52179106);山东省自然科学基金计划(ZR2018QEE008);济南市科技计划项目(201201145)。

摘  要:基于对项目地下系统设计现状的深入剖析,指出岩土与结构专业分离造成基坑临时支护资源浪费、环境污染、碳排放增加等弊病,提出深基坑岩土结构化永久支护体系理论与设计方法。阐明了永久支护体系构件组成与构造过程,给出了永久支护体系承载能力极限状态和正常使用极限状态设计原则;明确了基坑开挖、构建和正常使用三个阶段的荷载组合和计算内容,建议了深、较深基坑划分界限及其永久支护结构分别适用的有限元法和弹性支点法;强调应进行支护构件的耐久性分析,证明了岩土结构化深基坑永久支护结构地下室外墙基本不承担土压力,改变了目前开挖阶段支护结构、使用阶段地下室外墙分别承担土压力即两倍建筑材料抵挡土压力的现状,显示了深基坑永久支护结构的工程价值及其推广的意义。Based on the in⁃depth analysis of the current design status of the underground system of the project,the disadvantages such as wasting of temporary support resources,environmental pollution and carbon emission increase caused by the separation of geotechnical and structural specialties in the foundation pit was pointed out,and the theory and design method of the geotechnical structural permanent support system of deep foundation pit was put forward.The composition and construction process of the permanent support system were explained,and the design principle of the limit state of the permanent support system’s bearing capacity and normal use limit state was given.The load combination and calculation contents of three stages of excavation,construction and normal use of foundation pit were clearly defined,and the finite element method and elastic fulcrum method applicable to the division limits of deep and deep foundation pits and their permanent supporting structures were suggested respectively.It is emphasized that durability analysis of support components should be carried out,and it is proved that the basement exterior wall of permanent support structure of geotechnical structural deep foundation pit is basically free from earth pressure,which changes the current situation that the support structure in the excavation stage and the basement exterior wall in the use stage bear soil pressure respectively,that is,twice the building materials resist soil pressure,and shows the engineering value of the permanent support structure in deep foundation pit and its popularization significance.

关 键 词:深基坑 岩土结构化 永久支护结构 耐久性 

分 类 号:TU443[建筑科学—岩土工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象