高炉新建兰炭制粉系统的工艺设计  

Process Design of the New Semi-coke Powder Making System for Blast Furnace Construction

在线阅读下载全文

作  者:杨跃[1] Yang Yue(Baosteel Engineering Technology Group Co.,Ltd.,Shanghai 201901,China)

机构地区:[1]宝钢工程技术集团有限公司,上海201901

出  处:《山西冶金》2024年第5期193-195,共3页Shanxi Metallurgy

摘  要:某钢厂新增一套全兰炭的磨煤制粉系统,以满足高炉喷煤需求。在借鉴现有成熟的中速磨负压工艺技术的同时,充分考虑兰炭水分高、磨损性等问题,采用不设煤粉缓冲仓工艺技术,对设计方案进行优化与改进。实践应用表明,该方案运行可靠、稳定,对后续类似的高炉喷煤系统进行新增制粉能力项目改造,具有一定的参考意义。A steel plant has added a coal grinding and powder making system with all semi-coke to meet the coal injection needs of the blast furnace.While drawing on the existing mature medium speed grinding negative pressure process technology,fully considering issues such as high moisture content and wear resistance of semi-coke,and optimizing and improving the design scheme,adopting the process technology without a coal powder buffer bin.Practical applications have shown that this scheme operates reliably and stably,and has certain reference significance for the subsequent retrofitting of similar blast furnace coal injection systems with new powder production capacity projects.

关 键 词:高炉喷煤 兰炭 煤粉制备 煤粉仓 

分 类 号:TF538.63[冶金工程—钢铁冶金]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象