检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王超 Wang Chao(Shanxi Shouyang Luyang Xiangsheng Coal Industry Co.,Ltd.,Shouyang Shanxi 045400,China)
机构地区:[1]山西寿阳潞阳祥升煤业有限公司,山西寿阳045400
出 处:《山西冶金》2024年第5期206-208,共3页Shanxi Metallurgy
摘 要:为保障6301工作面沿空留巷围岩的稳定性,根据6号煤层的赋存条件及工作面特征,结合静力破岩原理,具体进行静力破岩切顶卸压方案的设计,设计钻孔长度为6 m,倾角偏向采空区一侧70°,钻孔间距为0.9 m,采用隔孔装药胀裂工艺;基于6301胶带顺槽特征,结合矿井生产经验,对巷道基本支护、巷旁充填体及临时支护方案进行设计,并在留巷期间进行围岩变形情况的监测分析。结果表明:6301胶带顺槽沿空留巷顺利实施,围岩变形合理,满足使用要求。In order to ensure the stability of the surrounding rock along the goaf in the 6301 working face,according to the existence conditions of No.6 coal seam and the characteristics of the working face,combined with the static rock breaking principle,the design of the static rock breaking and roof cutting and pressure relief plan is specifically carried out,and the drilling is designed.The length is 6 m,the inclination angle is 70°to the side of the goaf,the drill spacing is 0.9 m,and the split-hole charge expansion process is adopted.Based on the characteristics of the 6301 belt along the groove,combined with the mine production experience,this paper designs the basic support for the roadway,the filling body next to the roadway,and temporary support schemes,and monitors and analyzes the deformation of the surrounding rock during the retention period.The results showed that 6301 belt was successfully implemented along the goaf along the goaf,and the surrounding rock deformation was reasonable,which met the requirements of use.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49