国家重大科技基础设施运行管理的改进方法与实践——以EAST全超导托卡马克核聚变实验装置为例  被引量:1

Management Improvement Methods and Practices of the Major National Science and Technology Infrastructure:A Case Study of EAST

在线阅读下载全文

作  者:邓泉 尹红星 刘志宏[1] 李玥[2] 陈洪莲 夏金瑶 Deng Quan;Yin Hongxing;Liu Zhihong;Li Yue;Chen Honglian;Xia Jinyao(Institute of Plasma Physics,Hefei Institutes of Physical Science,Chinese Academy of Sciences,Hefei 230031,China;Bureau of Basic Science and Technology Capability,Chinese Academy of Sciences,Beijing 100864,China)

机构地区:[1]中国科学院合肥物质科学研究院等离子体物理研究所,安徽合肥230031 [2]中国科学院科技基础能力局,北京100864

出  处:《科技管理研究》2024年第10期170-177,共8页Science and Technology Management Research

基  金:中国科学院合肥大科学中心项目“EAST装置运行维护规范”(E05S0K11)。

摘  要:中国科学院合肥物质科学研究院等离子体物理研究所先后建成中国第一个圆截面超导托卡马克核聚变实验装置,以及世界上第一个非圆截面全超导托卡马克核聚变实验装置(EAST)。为持续改进EAST的运行管理,从顶层设计、组织实施和评估评价等方面分析EAST管理实践的有关探索与创新,具体包括:建立所领导、物理与实验运行部至一级系统的三级管理体系,能够更好围绕成果产出进行统一规划和分级管理;基于“计划—实施—检查—行动(PDCA)”管理理论,形成覆盖EAST运行周期的全过程管理机制;通过国内外评估制定设施中长期、近期计划,设置物理与实验运行部,负责主导EAST装置运行计划与目标的制定。另外,根据设施构成、结合运行需求设置一级系统,起用青年骨干担任负责人,分解任务、明确责任;同时,加强设施运行评估,部署实施系列改进举措,如优化基础研究组织模式和管理方式、创新国际合作模式等。根据EAST运行管理经验,对中国重大科技基础设施的运行和管理提出优化科研组织模式、完善管理方法、建设大科学工程团队、加强开放与合作等对策建议。At present,China has made great achievements in the construction of major scientific and technological infrastructure.However,there is still a certain gap with the world-class infrastructure in operation management,the operation efficiency,whole process management method in the operation stage,and the post-evaluation management need to be further improved and optimized.The Medium-and Long-Term(2012-2030)Plan on Infrastructure Construction for China's Major Science and Technology Projects,released by the Party Central Committee,clearly proposes to improve the management system of major national science and technology infrastructure.These initiatives include standardizing and promoting construction,optimizing operation and management,formulating management methods that align with the characteristics and development principles of infrastructures,strengthening operational evaluation,and improving the operational efficiency of these infrastructures.Thus,conducting further research on the constructive strategies for scientific and efficient operation management,based on the practical experiences,is of great significance.The Institute of Plasma Physics of Hefei Institute of Physical Science,Chinese Academy of Sciences(ASIPP)has built China's first regular superconducting Tokamak(HT-7)and the world's first non-circular experimental advanced superconducting Tokamak(EAST).To better manage EAST,this paper analyzes the exploration and innovation practice of the EAST from three aspects:top-level design,experimental organization,and evaluation.The three-level management system has been established from the leadership,the physics and experimental operation department(PEOP)to the first-level system,aiming to implement unified plan and hierarchical management for more outputs,in accordance with the management theory of"plan-do-check-act",the whole process management mechanism of EAST operation cycle has been formed.Specially,based on domestic and international evaluations,the medium-and long-term,as well as short-term plans for i

关 键 词:国家重大科技基础设施 全超导托卡马克核聚变实验装置 运行规划 设施管理 管理制度 大科学工程 

分 类 号:G311[文化科学] G301

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象